- Location
- Dallas, TX
- Scope
Annual inspection and certification of 64 fume hoods for Dallas Community College. The certification includes measurement and adjustment of the hood face velocity at various hood sash heights ensuring face velocity requirements are met in addition to verifying the hood capture using smoke to visualize the airflow in the fume hood. To complete the process, we provide labeling of the maximum sash opening, and a certification sticker indicating to the user that the chemical fume hood is performing as expected.
- Project Notes
Richland Campus
Mountain View Campus
Cedar Valley Campus